LAFOLLETTE, TN (WLAF) – TDOT brought the orange barrels.  Drivers need to bring their patience and safe driving skills.  Construction on the General Carl W. Stiner Highway is underway.
Clearing along Highway 63 (Stiner Hwy) between Cross Valley Road and Woodson Lane-Frontier Road has begun.
The right of way on the north side is being cleared back to the survey clearance line.
According to T-DOT, motorists should be alert for possible temporary lane closures through the construction zone.  Drivers  should be alert for slow or stopped traffic, and possible delays are expected.  Bottom line is that extreme caution needs to be exercised through the area.  (WLAF NEWS PUBLISHED – 09/28/2020-6AM-PHOTOS COURTESY OF WLAF’S CHARLIE HUTSON)